agriculture, Economy, El Salvador Government, Environment, Mining, U.S. Relations

The Debate Over Public-Private Partnership Law and MCC Funding in El Salvador

Last week Pacific Rim Mining Company announced it is seeking $315 million dollars in damages from El Salvador. It was a stark reminder that the 8-year old mining debate, which included several years of threats and violence between mining supporters and opponents, has yet to been resolved and could still result in a devastating economic blow to El Salvador.

As the mining issue continues, another debate with the potential to become just as volatile is brewing. In March the Funes Administration provided some details about its proposal for a second round of funding from the Millennium Challenge Corporation (MCC), a US aid program started by President Bush in 2004. The proposal is worth $413 million dollars, half of which will likely go towards an infrastructure project like improving the Litoral Highway that runs along El Salvador’s southern coast. The other half is likely to help finance public-private partnerships and improve human capital, which seems to mean education.

As details of the proposal emerge, opposition to a second round of MCC funding is growing. So far, opposition has opened on two fronts. The Salvadoran labor movement has been the most outspoken opponent, denouncing the proposed Law on Public Private Partnerships (P3 Law) since last year. Environmentalists and communities in the Lower Lempa region of Usulután have been less outspoken, but oppose the MCC proposal because the public-private partnerships will support tourism, which they strongly oppose. In 2011, members of the anti-mining movement also spoke out against the P3 Law fearing it would result in mining activities.

Mangrove Forests near La Tirana, a community targeted for a large tourism project
Mangrove Forests near La Tirana, a community targeted for a large tourism project

Because politicians within the FMLN are supporting the MCC, the politics of opposing the P3 Law and tourism are a little more complicated than opposition to mining was. Other than a protest outside the US Embassy in March and other small activities organized by the labor movement, opposition has remained largely behind closed doors, which may change soon.

            The Public Private Partnership Law

US Ambassador Maria Carmen Aponte said in October 2012 that approval of a second round of MCC funds relies on the passage of the P3 Law. The labor movement and their international supporters, argue that the P3 Law will privatize government operations including the airport, seaports, health care facilities, and other important services. They fear it will result in the loss of thousands of jobs, increasing the country’s already high rates of unemployment and driving wages down even further.

The labor movement and other opponents also do not want the private sector to control important resources and services like water, education, and health controlled. For example, Salvadoran civil society has fought against privatization of water for many years, making it such a toxic issue that politicians are unable to advocate for it publicly. Just like the government has not been able to privatize water, civil society organizations have not been able to pass a water law they have been promoting for over 8 years. Among other things, the law would protect water resources from privatization. Similarly, in 2002 then President Francisco Flores tried to privatize part of the health care system, but health care workers and many others took to the streets and forced the government to back off. Opponents of the P3 law fear it will make it easier for the government to accomplish what it has failed to do in the past – privatizing water and health care.

Supporters of the P3 Law, including President Funes, counter that public-private partnerships are not privatization, and the government will not privatize any important services, like health and education. They argue, instead, that public-private partnerships will result in more foreign direct investments, injecting capital into services and industries that are lagging behind.

The labor movement and other activists fear, however, that while not called privatization, the P3s are a way to accomplish the same goals. Concessions could last as long as 40 years, which means the state is essentially relinquishing control of an asset. Similarly, while capital investments are needed, the P3 Law will allow private, international investors to generate profits from basic services in El Salvador and take the profits overseas instead of re-investing in El Salvador.

Public-private partnerships are not new in El Salvador – they government has contracted out many operations to private companies over the years. One regular criticism is that these relationships prioritize profits over the well being of Salvadorans. For example, in the aftermath of the October 2011 floods, communities and organizations in the Lower Lempa blamed the CEL for washing them out. The CEL is the state-owned agency that manages the dam, generating electricity that private power companies sell for profit. The more electricity produced, the more money the companies make. In the months after the 2011 floods CEL representatives responded frankly, stating they operate the dams to make electricity and generate profits, not protect the people downstream.

FESPAD and Voices on the Borders 2012 legal interns recently published a full analysis of the P3 Law.

Tourism and other Investments

One of the public-private partnerships being proposed in the second MCC compact is tourismhotels and resorts being built along El Salvador’s Pacific coast. In December the government solicited proposals from the private sector and received 49 responses, 27 of which are tourism projects in Usulután, La Paz, and La Libertad.

Tourism is not inherently bad, but communities in the Lower Lempa of Usulután fear that building hotels and resorts in and around their important and fragile ecosystems will cause irreparable harm. One Lower Lempa community targeted for a tourism project is La Tirana, an isolated and economically poor community located at the edge of one of the most pristine mangrove forest in Central America. In addition to its immense natural beauty, the forest supports thousands of species of flora and fauna. The nearby beaches are protected as a nesting ground for several species of endangered sea turtles. Residents of La Tirana fear tourists would damage the fragile mangroves with construction of houses and resorts, jet skis and motorboats, and solid waste and sewage, while displacing local residents and their farms.

Proponents of tourism argue that resorts and hotels in places like Tirana would provide jobs and spur the local economy. They believe this to be especially important in communities, such as those in the Lower Lempa, that have had their agricultural economy diminished by free trade. But locals doubt resorts will help the local economy. They know that hotels are much more likely to hire bilingual youth from San Salvador who have degrees in hotel management than poor campesinos who barely have a sixth grade education.

Voices staff recently met with community members in La Tirana, and they are very much against outside investors building resorts in their region. Recognizing that they live in a special place, the community board is proposing that the community build a series of small, humble cabanas that would have a small ecological footprint, but provide comfortable housing for a small number of guests. They are also proposing that the community build a small community kitchen that could feed guests. The community wants to develop its own small eco-tourism industry that it can regulate and ensure does not harm the forest or turtle nesting ground. It would also mean that the money from tourism would benefit the community, and not just make wealthy investors in San Salvador or abroad even richer.

Other communities in the region are even more vulnerable than La Tirana. In El Chile and other small communities, many residents still do not have title to their land. They fear that if a private investor wants to build a hotel or resort the State could take their land and they would have no legal recourse.

Our staff also met with other communities in the Lower Lempa – Comunidad Octavio Ortiz, Amando Lopez, Nueva Esperanza – and several local organizations. They are also completely opposed to tourism projects in the region. They fear that hotels and resorts will further destroy agricultural land, use up limited water resources, and destroy local culture. The community of Octavio Ortiz even wrote in their strategic plan that they see tourism as a large threat to farming and their peaceful way of life.

While most of the public-private partnership proposals involve tourism, there are quite a few agricultural projects. According to PRESA, the government agency managing the project proposals, they received 14 requests to support production of exports in dairy, mangoes, limes, and honey. In order to be considered for a public-private partnership, investors have to have $100,000 in capital and be producing export crops. The capital requirement means local farmers will not be able to participate. And the requirement that products be grown for export means even more land will be dedicated to products that do not contribute to food sovereignty, which is a top priority for the region.

There are also civil society leaders and academics in El Salvador who oppose the MCC because they see it as the latest phase in implementing a neoliberal economic agenda in their country. They hold it in the same regard as the privatization of state assets (1990s), dollarization (1995-2001), Central American Free Trade Agreement (2006), the first MCC compact (2007-2012), and Partnership for Growth (2011). Similarly, Gilberto Garcia from Center for Labor Studies (CEAL, in Spanish) believes the

highway projects, including the northern highway funded by the first MCC compact and the Litoral Highway project planned for the second compact, are part of an effort to build a land bridge in Guatemala. The “Inter-Oceanic Corridor” will connect ports on the Pacific coasts of Guatemala and El Salvador with Caribbean or Atlantic ports in Guatemala. ODEPAL is managing the project in what they call a public-private partnership. The land bridge is located in Guatemala, but it is right on the borders with El Salvador and Honduras, giving both countries easy access.

Politics of Opposing the MCC and P3 Law

Building a strong national movement around opposition to the second MCC compact and the P3 Law may be more difficult than organizing Salvadorans against mining. While the anti-mining movement was able to reduce the debate to a single issue that all Salvadorans could understand – i.e. gold mining will destroy water resources for 60% of the country – most people believe that tourism, better highways, and other capital investments are always good. Similarly, the P3 Law is fairly abstract and difficult to reduce into a simple message that the majority of Salvadorans can relate to their everyday lives.

The politics around the MCC and P3 Law will make it more difficult to achieve the kind of nation-wide opposition that the anti-mining movement was able to garner. During the mining debate, the FMLN (leftist political party) was the opposition party and had the political freedom to take an anti-mining position. The FMLN is now in power and has to consider the economic and political interests that helped them get there. President Funes and FMLN presidential candidate Sanchez Cerén support the P3 Law and MCC compact, arguing the investments will be good for the economy. According to anonymous sources, many of the same business interests that helped Mauricio Funes with the 2009 presidential elections will benefit from the P3 Law and MCC funds. FMLN legislators have been a slower to sign on to the P3 Law. At times FMLN legislators have said it was not their top priority, and more recently they have tried to negotiate amendments to exclude certain sectors such as health and education from public-private partnerships. Officials from the conservative ARENA party have accused the FMLN legislators of not supporting the law because they want to implement a socialist economy agenda.

But the civil society organizations, communities, and labor unions that are opposed to the P3 Law and the MCC funding generally make up much of the FMLN’s base. If Sanchez Cerén and his supporters continue to embrace the P3 law and the MCC funding, while many in their base protest against it, it could exacerbate an existing split within the party in the months leading up to the February 2014 presidential elections. Many former FMLN militants and supporters, especially in the Lower Lempa, already believe the movement they once fought for no longer represents their interests and values.

Though the US and Salvadoran governments want to pass the P3 Law and sign the MCC compact before the elections, many opponents are gearing up for a long struggle. Even if the P3 Law passes, when the government wants to enter into a public-private partnership the Legislative Assembly will have to approve it. They are likely to face great scrutiny and opposition. Similarly, developers wanting to break ground on tourism projects in La Tirana and other communities are likely to face some rather significant legal and social barriers – much like Pacific Rim faced in Cabañas.

2014 Elections, El Salvador Government

ANEP (National Association of Private Enterprise) taking on Presient Funes, Again!

At 2:40 the morning of August 17, the Salvadoran Legislative Assembly finished a series of reforms that changed the way 19 autonomous state entities elect their boards of directors. The reforms, which proponents downplayed as relatively minor, drew the ire of ANEP (National Association of Private Enterprise) and further exposed an ongoing feud with President Funes and the FMLN party.

The reforms target entities such as the CEL, which operates El Salvador’s hydroelectric dams, and CEPA, which oversees the country’s ports including the Comalapa International Airport. They also target ANDA, which manages El Salvador’s water and waste management systems, FOVIAL, which takes care of the highway and roads, and ISSS, part of the government health care system.

Though these entities operate like private corporations and enjoy some autonomy from the government administrators, they exist to provide public services and are regulated by law. The President of El Salvador has always appointed the heads of these institutions. The August 17th reforms expand the President’s authority by giving him a role in choosing members of the boards from the non-governmental sector. When these 19 entities need new board members from the non-governmental sectors, they will present the President with a slate of three candidates of their choosing and he will select one. It used to be that ANEP appointed the board members from the non-governmental sector, but the reforms diminish their role in the process.

The relationship between ANEP, the government, and these autonomous state institutions is a little complex. According to their website, ANEP is a nonprofit organization created by Salvadoran businesses in 1966. Its mission is to “coordinate efforts of private initiatives to promote the economic, social, and cultural development of the country, and defend the free enterprise system in El Salvador.” ANEP represents more than 49 trade guilds and 14,000 employees from all sectors of the Salvadoran economy.

Over the years, ANEP has been a driving force behind El Salvador’s embracing free trade and deregulation. In addition to local trade guilds, ANEP’s membership includes 153 large transnational corporations such as 3M, Kimberly Clark, Microsoft, Nestle, British American Tobacco, Sherwin Williams, Texaco, and many others. (see The Nation in the Global Era: Conflict and Transformation, by Jerry Harris, Brill 2009). Each year, ANEP and these transnational corporations hold an economic conference call ENADE (National Gathering of Private Enterprise) from which they generate a report recommending reforms and legislation – many of which are enacted. According to Jerry Harris, this is how larger international corporations influence the government and create a favorable business climate in El Salvador.

Last week, an editorial piece in Diario CoLatino posed a valid question – why does ANEP have to be part of the government? The editorial also asks, “is it legitimate and inclusive that ANEP has representatives in these autonomous organizations, making it part of the government without obligation to a [political] party or government program?” The author indicates that ANEP cites their business expertise to justify their involvement, and that they are a civil society organization and should be responsible for appointing civil society representatives.

While that may be, its more probable that ANEP’s role in these autonomous entities, which provide such important public services, is more a product of their close relationship with the conservative ARENA party. Since the mid-1980s ANEP and members of ARENA have had many of the same political and economic interests. Leaders of El Salvador’s business sector, which is represented by ANEP, have also been the most ardent supporters of, and at times leaders of, the ARENA party. For example, before he became President of El Salvador in 2004, Tony Saca was a prominent business leader in El Salvador and served as president of ANEP. Because they shared so many economic and political interests, and were often comprised of the same people, it made sense for ARENA to carve out a space for ANEP by giving them significant control over the autonomous entities.

Their historical relationship with the ARENA party may help to explain the current conflict with President Funes and the FMLN party. It is already election season. Even though the Salvadoran presidential elections are a grueling 18-months away, the ARENA and FMLN parties began focusing on control of the executive branch immediately after the March 2012 municipal and legislative elections. The language coming from both sides indicates that the feud is political.

In justifying the reforms, President Funes and the FMLN skipped right over the question addressed in the CoLatino editorial – why does ANEP have a role in the first place? Funes instead said that greater government oversight was needed because ANEP did nothing to investigate or prevent the corruption perpetrated by leaders of some of the autonomous entities. The President specifically mentioned the 2002/3 ANDA scandals in which Carlos Perla made off with millions of dollars that should have been used for a water project (click here for a good summary of the Carlos Perla case). He also mentioned corruption scandals in the ISSS (a government health care provider) and BFA (Agricultural Bank). Funes placed responsibility on ANEP and ARENA without explicitly accusing them of involvement, since the scandals happened during their watch.

In response to ANEP’s reaction to the reforms, President Funes said he did not even know why they were taking such a strong position. He also accused them of trying to dynamite the negotiations that ended the constitutional crisis. He added, “there are groups busy creating a destabilizing environment. ANEP has been destabilizing the country, torpedoing the situation [negotiations] and has tried to manipulate the roundtable.” Since Funes took office in June 2009, there have been allegations that the most extreme members of the conservative parties have tried to destabilize the FMLN and Funes Administration by causing social and economic crises.

ANEP began their attacks against the FMLN and Funes administration in May, accusing the administration of mismanaging the economy.  The most heated rhetoric started coming in June and July when this summer’s constitutional crisis flared up. (For more on the constitutional crisis, we recommend Tim’s Blog). ANEP publically stated that as long as the President and his administration “continues their assault against democracy, the independent judiciary, and respect for the constitution, the private sector will not participate in the Economic and Social Council, CES.”

In response to the August 17th reforms, ANEP posted a statement to their Facebook page saying, “What Funes did today is exactly the same that other non-democratic presidents of ALBA countries [Bolivarian Alliance for the Americas, which includes Venezuela, Bolivia, Ecuador, Nicaragua, and Cuba] have done. And now those countries are immersed in the worst crisis of authoritarianism and lack of freedom in all of Latin America.” ANEP President Jorge Daboub also called the Funes government a dictatorship.

This is the same language that ARENA candidates and their surrogates and supporters have used against the FMLN for many years. Staff at the US Embassy and even members of the U.S. Congress used similar language during the 2004 campaign when ARENA candidate Tony Saca defeated FMLN candidate Shafick Handal. Members of Congress tried to influence Salvadoran elections again in 2009 when FMLN candidate Mauricio Funes defeated ARENA candidate Rodrigo Avila. This summer Mary O’Grady has used her position on the Wall Street Journal editorial board to post op/ed pieces laced with this same kind of extreme rhetoric, attacking both the FMLN and Sanchez Cerén who will represent them in the 2014 elections.

The August 17th reforms that decrease the role of the ANEP in these autonomous government agencies is probably not a bad thing. Not because ANEP is corrupt or incapable, but as Diario CoLatino editorial piece noted, because its not really their place to have such a large role in these public entities.

The 19 entities targeted by the reforms manage over $1.6 billion in public resources and have a profound impact on the lives of every Salvadoran. Voices on the Border’s partner communities in the Lower Lempa, for example, struggle every year with flooding caused in large part by the September 15th Dam managed by the CEL, one of the entities affected by the reforms. The CEL makes more money when their reservoirs are full at the end of the hurricane season – they are able to generate more electricity farther into the dry season. Full reservoirs, however, means that if there is a big storm, like Tropical Storm 12-E that dumped 55 inches of rain in El Salvador last October, communities downstream will likely flood. The August 17th reforms increase the likelihood that someone from the Lower Lempa or at least sympathetic to their flooding issues could get appointed to the CEL board and influence management of the dam.

 

Advocacy, Climate Change, El Salvador Government

Communities still demand reconstruction in the Lower Lempa

This is a translation of Contrapunto‘s February 13th note about our partners in the Lower Lempa.

By Gloria Morán

Photo: Luis Veláquez

San Salvador – It has been two months since the Salvadoran President, Mauricio Funes, promised to invest around 21 million dollars for the reconstruction efforts in the Lower Lempa.  Today, representatives from the region are denouncing the failure to fulfill this promise.

On December 19th Funes made this promise, just after the Lower Lempa had suffered the some of the worst impacts of Tropical Storm 12E in October 2011.  “The first priority is the recovery of the levees along the shores of the Lempa River; then the rehabilitation of the drainage ditches, and the construction of two permanent shelters that can provide security and hygiene should future evacuations prove necessary”, announced Funes to local residents in December.

At that moment the Salvadoran representative assumed, with authority, the reconstruction as part of the historic debt owed to the residents of the Lower Lempa, noting that they had discover drainage systems that hadn’t been maintained in over 30 years.

Of these promises, Gilberto Berríos of United Communities (ACUDESBAL), assured us that “of that promised, still nothing has been done”.  The residents of the Lower Lempa, above all, ask that the government repair and rebuild the damaged levees as quickly as possible.  They also demand that they begin the cleaning and rehabilitation of the drainage system and the reconstruction of the main roads that were washed out.  They also insist that the hydroelectric company, CEL, establishes a protocol for discharges so that the residents know when they will release the water, and how much.

They also request that the government create an integral plan to provide health, education, and basic services to the local population; not just reconstruction.  “What is happening now, since nothing is being repaired, is that we are preparing for another flood”, said Maritza Hernández, another representative from the Lower Lempa, who affirmed that time is their worst enemy.

José Acosta, representative in the Lower Lempa for the Center for Appropriate Technology (CESTA), expalined that the greatest worry of the communities is the imminent arrival of the rainy season [around May], and there has been no progress.  Berríos explained that they have seen the contractors who are responsible for the reconstruction in the region, but they have only cleaned-up and marked-off the areas where “we suppose they plan on doing some work, but this is insufficient”.

The representatives of the communities expressed that this is nothing new.  They have been waiting 13 years since Hurricane Mitch and the levees are still incomplete.

According to the surveys done by organizations in the region, 29 communities have been directly affected, of about 2,000 families. [in Jiquilisco]

In regards to the unfulfilled promises made by the president, the head of the Human Rights Ombudsman’s office (PDDH), Oscar Luna, said that as an institution they are requesting the necessary measures so that the residents of the Lower Lempa and other communities receive the help they need in so far as rehabilitation and reconstruction.

Voices note:

The promises made on December 19th by President Funes were considerably more modest than those announced just 3 days after Tropical Storm 12E.  On October 20th, Funes flew into the offices of the Mangle Association in the Lower Lempa and declared that the government and the CEL hydroelectric company would build levees, clean the drainage system, build shelters and dredge the Lempa River.  He also emphasized the government’s interest in establishing the Lower Lempa as a key region for agricultural development in El Salvador, as well as the their commitment to an integral risk management policy.  On November 15th Funes reiterated these promises, even going on to explain that the CEL wanted to just repair a few of the levees, but he had ordered them to include all of the communities, especially along the Tecoluca side of the river. According to a delegation of German Engineers from 2003, it would cost about 400 million dollars to complete all levees, drains, and to dredge the river.  The 21 million that the CEL and the Salvadoran government finally signed off on is really just another band-aid on an increasingly compromised infrastructure.  If the contractors continue the ‘reconstruction’ effort at this pace, the effort will certainly be of little use in the Lower Lempa.

Advocacy, El Salvador Government, Hydro Electric Dams

The CEL Medical Clinic and Nuevo Amanecer Protests

Last Friday we posted about the CEL hosting a medical clinic in the Lower Lempa and a community organizing a protest about the October floods. Our staff visited both events and we have a few more details.

Thursday night of last week, the CEL (the public/private corporation that manages the country’s hydroelectric dams) arrived in La Canoa (a.k.a. Comunidad Ocatavio Ortiz) and set up tents for the medical brigade, which was held on Friday. Word of the clinic spread pretty quickly and many in the region considered it to be an attempt to pacify those who blamed the CEL for the October flooding, and generate good will in the region.

On Thursday, a team from the CEL set up tents at the Unidad de Salud in La Canoa for the Friday medical brigade

The region’s general attitude towards the clinic was best summarized by a banner that some community members hung over the road next to the clinic sometime late Thursday night or early Friday morning. The banner read:

“Ayer nos inundaron… Hoy nos endulzan con 4 pastillas…”

“Yesterday you flooded us… today you sweeten us with 4 pills…”

Banner over the road next to the Unidad de Salud in La Canoa

When the CEL arrived at the clinic on Friday morning to finish setting up, they wanted to take the banner down, but the a community representative would not allow it. According to locals, turnout was low. Even though people are in need of the services and medicines they did not want to take them from the CEL. When it became evident that turnout would be low, the CEL sent a truck around the communities advertising the clinic, but the turnout was underwhelming.

The communities’ response to the clinic was also somewhat underwhelming. As much anger and frustration among people throughout the region, the banner that hung across the road was the only form of protest at the clinic site. In fact, the community board in La Canoa approved the CEL using the clinic; some members of the board even took advantage of the clinic’s services.

Since we posted on Friday, we also learned more about the military presence in the clinic. Giving the military the benefit of doubt, the local Ombudsman for Human Rights said that the military was probably there to continue supporting people in the region. They had, after all, been an integral part of the rescue effort during the October floods.

A community member, however, approached one of the soldiers and asked why the military was there. He answered quite frankly that they were “providing security.” When pushed on who had given them orders to provide the CEL with security, the soldier seemed to realize that he had said too much and stopped answering questions. The Salvadoran constitution is clear that the military is prohibited from engaging in domestic issues unless it is a national crisis. Rescuing residents from the worst flooding in the nation’s history arguably falls into the category of national crisis, while providing protection for the CEL likely does not. The Ombudsman and other government agencies should investigate the use of the Military.

Though the banner was the only form of protest in La Canoa, sources clarified that the protest on the bridge in San Marcos de Lempa was a direct response to the medical clinic and the CEL’s apparent attempt to pacify those upset about the floods. Residents of Nuevo Amanecer took over the bridge on the main highway, shutting down the main corridor that traverses the southern coast of El Salvador to show that they could not be bought off. More than a couple protesters commented that they were disappointed that residents allowed the clinic to open in La Canoa without more protests.

This slideshow requires JavaScript.

Protesters made only a couple broad demands during the two hours they had the highway closed down. They want the CEL and government to help them rebuild their lives and prevent more flooding in the future. And they wanted to send a clear signal that they would not be bought off.

Climate Change, Disasters

Update from the Lower Lempa

A couple updates from the Lower Lempa this morning. Three weeks after floods devastated the region, communities have organized the first demonstration against the CEL (the corporation that manages the hydroelectric dam upstream from the communities). While the demonstration is going on, the CEL and Salvadoran Military have set up a health brigade in the community of La Canoa (Comunidad Octavio Ortiz). Information is still coming in, but here’s what we know so far.

Residents from Nuevo Amanecer, one of the communities most devastated in the October floods, have taken over the Highway 2 bridge that crosses the Lempa River just north of the communities in the Lower Lempa. The highway is one of the main roads through the southern region of the country and the bridge is the only way to get over the river without driving more than an hour north to the Pan American Highway.

Bridge over the Lempa River, currently held by residents of Nuevo Amanecer. This photo was taking during the October floods, when the river was flooding communities downriver.

People on the ground say the Nuevo Amanecer residents are protesting the CEL and their management of the dam before and during Tropical Storm 12-E, which dumped 55 inches of rain on El Salvador. Locals throughout the region, not just Nuevo Amanecer, believe that the CEL manager failed to release enough water in the early part of the storm forcing them to release at extremely high levels during the later part of the storm, resulting in the extreme flooding.

Communities in the region are traumatized and have held a few open meetings to discuss the best way to respond to the CEL and advocate for reconstruction. Today’s protest doesn’t appear to have been planned at any of these region-wide meetings, but surely other communities are supportive of their efforts. And surely this is only the first of such demonstrations.

While protesters block the bridge, the CEL is engaged in their own public relations activity in La Canoa (Comunidad Octavio Ortiz). Yesterday afternoon, residents of La Canoa were surprised to see military trucks and the CEL at their small medical clinic setting up tents for a health brigade. This morning, the CEL and military are offering free medical services and medicines to locals. Though a lot of people are sick and in need of medicines following the flood, only a handful of people have taken advantage of the services.

According to a local health promoter, the president of the community board in La Canoa approved the clinic, but most residents do not want to be a part of what they perceive to be public relations campaign.

There are a couple things that are a little odd about the health brigade. One is that the military is present. Military units were deployed to the region to help with evacuations, so they do have an interest in the region, but according to locals their presence seems more intended to intimidate would-be CEL protestors than to help flood victims. And, if the CEL and Military really wanted to help flood victims they should be in Nueva Esperanza, Nuevo Amanecer, Ciudad Romero, or Zamorano – all five miles up the road from La Canoa. Perhaps the CEL asked these communities to host the event and they declined?

We will provide more information on the medical clinic and protests later in the day.

Advocacy, Climate Change, Disasters, El Salvador Government

Flood Recovery update in the Lower Lempa

More than two weeks after El Salvador’s historic floods, victims continue the slow recovery process. As people clean their homes and live with very real public health issues, they are also planning how to protect themselves against future storms.

Days after the Lempa Rivera completely flooded communities along its banks in Usulután and San Vicente, we posted an article on the public health concerns residents would likely face when they returned home. We are very sad to report that this week an 18-year old male in Salinas del Potrero died when he contracted leptospirosis, a “rare and severe bacterial infection” that can occur when people are exposed to standing water in tropical regions. He most likely contracted the bacteria from water or food contaminated with urine from rats, cattle or other animals.

Other people are suffering from a wide variety of fungal infections, and according to our staff in the field, everyone they have talked to has a cold. The public health risks will remain a concern for the near future.

This week, the Funes Administration released their preliminary report on the flood damage – $840 million. The storm cost El Salvador $300 million in production alone, including the destruction of bean and corn crops, which would likely have yielded record harvests. El Salvador’s infrastructure sustained $260.58 million in damage, and there was another $207.8 million in damages to homes, schools, and health centers.

Residents of the Lower Lempa are still cleaning and trying to plan their next steps for recovery. Our field staff says that people continue hanging out clothes and personal belongings in the sun to dry, and that the entire region smells like a moldy swamp. Our staff also says that though our friends are as happy and hospitable as ever, they are definitely suffering.

Some farmers are debating whether to plant another crop of corn. Because the rainy season is all but over, they would be depending on the water in the soil to sustain the crop. They would be running the risk that the ground would dry up within the 2.5-month period until they could harvest. If the ground dried up, they would lose the $900 up-front investment they would have to make. If they were successful and harvested a crop, however, they would be able to get their family through the dry season with minimal support from aid programs.

People and organizations are also starting to talk a lot more about the CEL (the private corporation that manages El Salvador’s dams) and their management of the September 15th Hydroelectric Dam upriver. There is still insufficient information to determine whether they could have done more to protect communities in the Lower Lempa during the last storms, but groups are talking about the need for an audit of their performance.

An article in the La Prensa Grafica this week pointed to the tension between the CEL and the communities in the Lower Lempa. The CEL maximizes energy production and profits by maintaining high levels of water in the dam’s reservoir. The more water they have in the reservoir at the end of the rainy season, the more energy they can produce in the dry season. In the rainy season, the CEL can satisfy 59% of the nation’s energy needs, but that drops down to 20% in the dry season. The end of the rainy season is when there is the greatest threat of a large storm.

The CEL could make sure that the reservoir is empty going into the end of the rainy season when the threat of flooding is the greatest, minimizing the risk of flooding downriver. But this would mean that they run the risk of having no water in the reservoir dramatically decreasing energy production during the dry season when there are no rains. A full reservoir, on the other hand, means they can continue generating electricity and power into the dry season. It also means that if there is a large storm such as Tropical Storm 12-E, they have no choice but to release waters at a high rate, resulting in flooding.

As we have discussed in previous articles, many are blaming Tropical 12-E and the massive amounts of rain on climate change. This week the Archbishop of El Salvador echoed comments made by the Minister of the Environment and others, stating, “climate change is the most serious problem confronting humanity.” The Minister of the Environment said in the days after the flood that El Salvador needs to be a model for countries around the world in mitigating the impact of climate change – his statements seem to accept that climate change at this point is irreversible, and that they must figure out how to live with it.

Preparing for climate change, however, could be where the CEL and communities downstream from the September 15th Dam may find some common ground. The government has to repair or rebuild the levees in the Lower Lempa. The higher and stronger the levees, the more water the CEL can keep in their levees and the more energy they can produce without risking the communities downstream. Post Hurricane Mitch, the levees could withstand dam releases at no more than 2500 cubic meters per second. If the dams were built to withstand much more than that, the communities and CEL come out ahead.

Just this afternoon communities in the Lower Lempa are meeting to discuss their approach towards working with the CEL. As the communities, CEL representatives, and government officials move forward in planning for how to best deal with climate change, it is important to realize that if all of the parties work together, there is likely an outcome that benefits all stakeholders. We hope that those participating in the conversations can set aside their own short-term economic and political interests in service of collective long-term benefits.

Advocacy, Climate Change, Corruption, Disasters

Rains continue, flood waters recede in the Lower Lempa

Today community members report renewed access to San Marcos Lempa via the ‘paved’ road.  Many sections are washed out or still covered with a few inches of water, but smaller vehicles are now able to enter the communities.

Families from less directly affected communities such as Amando López and Octavio Ortiz are anxious to return to their homes, but Voices staff and other authorities are urging them to stay while the rain still falls.  It has been raining without pause throughout the country since the early hours of this morning.

ACUDESBAL (the local inter-communal association) and CESTA (an environmental NGO) published a press release denouncing the role of the September 15th hydroelectric dam in the near total devestation of many communities in the Lower Lempa.  The release says “During this climatic phenomena, the CEL again released 11,500 cubic meters per second, but unlike Hurricane Mitch, this amount of water was released for a prolonged period of time, and the river bed is more clogged [than in ’98’], which caused flooding from San Marcos Lempa all the way down to Montecristo Island”.  The release demands that CEL accept responsibility for their negligence, especially after an interview with the CEL president Irving Tochez, where he claims that CEL is in no way responsible for the devestation, but rather mitigated further disaster by ‘helping to retain water and releasing it in a controlled manner’.

They end by stating ” the road to recovery will be extremely difficult, but we know we can count on the support and solidarity among the organized communities, here and abroad”.

Economy, Environment

Wind Power in El Salvador

The Spanish organization Regulación Eólica con Vehículos Eléctricos (REVE) is reporting that the Hydroelectric Commission of the Rio Lempa (CEL) signed an agreement with the Spanish firm “Ibérica de Estudios e Ingeniería” (IBERINSA). The article states that:  

They will carry out feasibility studies for the construction of two wind farms. The agreement includes the donation of U$S 397,000 by the Spanish government.

For 15 months it will be conducted the wind measurement in the municipalities Metapan and San Isidro, in the west of the country. It is estimated 10 MW of generating potential for each wind farm. As reported by the representative of IBERINSA, if approved its construction, the wind farms could begin to generate clean energy in about two years.

The executive of the CEL, emphasized that the study will begin in a time when electricity demand in the country is very close to the offer and that the project is part of ongoing efforts for energy production with the use of renewable energy.

El Salvador, one of the most populous countries of Central America, has a maximum demand of 860 MW, with a generating capacity of 1,250 MW.

www.iberinsa.es/img_home/noflash.html

www.cel.gob.sv/

www.eep-ca.org/docs/presentaciones/gustavo_jimenez.pdf

www.lawea.org/indexesp.php